 | ![header=[JUSTICE CANADA HEADQUARTERS<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>7 storey, 30,000 m² heritage retrofit
</li><li>dynamic buffer zone wall protection
</li><li>friction damping seismic reinforcing
</li><li>new skylight covered atria
</li><li>prime consultant (in JV), structural, mechanical, electrical, civil</li></ul>] JUSTICE CANADA HEADQUARTERS](/images/projects/1_1.jpg) JUSTICE CANADA HEADQUARTERS OTTAWA, ONTARIO - 7 storey, 30,000 m² heritage retrofit
- dynamic buffer zone wall protection
- friction damping seismic reinforcing
- new skylight covered atria
- prime consultant (in JV), structural, mechanical, electrical, civil
|
| JUSTICE CANADA HEADQUARTERS |
| Heritage Building Retrofit |
![header=[SCOTIABANK PLACE<br>KANATA, ONTARIO] body=[<ul class='photo_info'><li>20,000 seat NHL arena and entertainment centre
</li><li>IES lighting award
</li><li>4.6 km of four lane arterial roadway
</li><li>parking for 6,500 vehicles
</li><li>mechanical, electrical, civil engineering</li></ul>] SCOTIABANK PLACE](/images/projects/1_2.jpg) SCOTIABANK PLACE KANATA, ONTARIO - 20,000 seat NHL arena and entertainment centre
- IES lighting award
- 4.6 km of four lane arterial roadway
- parking for 6,500 vehicles
- mechanical, electrical, civil engineering
|
| SCOTIABANK PLACE |
| NHL Arena |
![header=[CANADIAN CHANCERY<br>NAIROBI, KENYA] body=[<ul class='photo_info'><li>8,000 m² embassy
</li><li>concrete frame with curtainwall and rendered masonry infill
</li><li>energy efficiency, natural ventilation, solar domestic hot water
</li><li>1,000 kW diesel generator back-up of entire facility
</li><li>design adapted to local materials/techniques</li></ul>] CANADIAN CHANCERY](/images/projects/1_3.jpg) CANADIAN CHANCERY NAIROBI, KENYA - 8,000 m² embassy
- concrete frame with curtainwall and rendered masonry infill
- energy efficiency, natural ventilation, solar domestic hot water
- 1,000 kW diesel generator back-up of entire facility
- design adapted to local materials/techniques
|
| CANADIAN CHANCERY |
| Canadian Design Overseas |
![header=[OTTAWA AIRPORT EXPANSION<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>$310 M expansion of fully operational airport
</li><li>60,000 m² new Passenger Terminal Building
</li><li>16,000 m². Phase 2 Terminal Expansion
</li><li>site-wide high voltage power conversion
</li><li>prime consultant (in JV), architecture, structural, mechanical, electrical, civil</li></ul>] OTTAWA AIRPORT EXPANSION](/images/projects/1_4.jpg) OTTAWA AIRPORT EXPANSION OTTAWA, ONTARIO - $310 M expansion of fully operational airport
- 60,000 m² new Passenger Terminal Building
- 16,000 m². Phase 2 Terminal Expansion
- site-wide high voltage power conversion
- prime consultant (in JV), architecture, structural, mechanical, electrical, civil
|
| OTTAWA AIRPORT EXPANSION |
| Project Management & Design |
![header=[TIMMINS POLICE SERVICE COMMUNITY BUILDING<br>TIMMINS, ONTARIO] body=[<ul class='photo_info'><li>$10 M, 3,400 m² police services building
</li><li>integrated 911 Call Centre
</li><li>30 person boardroom, video conferencing, smart board technology
</li><li>secured separation of public, police and criminal areas
</li><li>sally port, detention cells, forensic lab, administrative and training</li></ul>] TIMMINS POLICE SERVICE COMMUNITY BUILDING](/images/projects/1_5.jpg) TIMMINS POLICE SERVICE COMMUNITY BUILDING TIMMINS, ONTARIO - $10 M, 3,400 m² police services building
- integrated 911 Call Centre
- 30 person boardroom, video conferencing, smart board technology
- secured separation of public, police and criminal areas
- sally port, detention cells, forensic lab, administrative and training
|
| TIMMINS POLICE SERVICES |
| Police Headquarters |
 | ![header=[NORTEL NETWORKS OPTICAL COMPONENTS FACILITY<br>KANATA, ONTARIO] body=[<ul class='photo_info'><li>$149 M, 34,000 m² office and manufacturing
</li><li>hyper-fast-track design/construction
</li><li>Class 100, 1,000 and 10,000 clean rooms
</li><li>site circulation and parking for 900 vehicles
</li><li>ACEC Award of Merit</li></ul>] NORTEL NETWORKS OPTICAL COMPONENTS FACILITY](/images/projects/1_6.jpg) NORTEL NETWORKS OPTICAL COMPONENTS FACILITY KANATA, ONTARIO - $149 M, 34,000 m² office and manufacturing
- hyper-fast-track design/construction
- Class 100, 1,000 and 10,000 clean rooms
- site circulation and parking for 900 vehicles
- ACEC Award of Merit
|
| NORTEL NETWORKS |
| Clean Room Manufacturing |
![header=[HILSON AVENUE PUBLIC SCHOOL<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>$7 M, K-6 school
</li><li>integrated daycare facility
</li><li>library, gymnasium, stage, atrium entrance
</li><li>high efficiency hydronic heating
</li><li>energy efficient lighting including daylighting control</li></ul>] HILSON AVENUE PUBLIC SCHOOL](/images/projects/1_7.jpg) HILSON AVENUE PUBLIC SCHOOL OTTAWA, ONTARIO - $7 M, K-6 school
- integrated daycare facility
- library, gymnasium, stage, atrium entrance
- high efficiency hydronic heating
- energy efficient lighting including daylighting control
|
| HILSON AVENUE PUBLIC SCHOOL |
| School and Daycare |
![header=[GARRY J. ARMSTRONG CENTRE<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>$26 M, 180 bed home for the aged
</li><li>100% fresh air with heat recovery
</li><li>100% emergency generator back-up
</li><li>construction staging and traffic control on 2.8 ha island site
</li><li>prime consultant, structural, mechanical, electrical, civil</li></ul>] GARRY J. ARMSTRONG CENTRE](/images/projects/1_8.jpg) GARRY J. ARMSTRONG CENTRE OTTAWA, ONTARIO - $26 M, 180 bed home for the aged
- 100% fresh air with heat recovery
- 100% emergency generator back-up
- construction staging and traffic control on 2.8 ha island site
- prime consultant, structural, mechanical, electrical, civil
|
| GARRY J. ARMSTRONG CENTRE |
| Home for the Aged |
![header=[JDS UNIPHASE HEADQUARTERS<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>25,000 m² office and manufacturing facility
</li><li>site servicing, roads, parking for 22 ha campus
</li><li>precise environmental control in manufacturing/packaging
</li><li>stringent vibration limits for manufacturing
</li><li>fast-track design and construction</li></ul>] JDS UNIPHASE HEADQUARTERS](/images/projects/1_9.jpg) JDS UNIPHASE HEADQUARTERS OTTAWA, ONTARIO - 25,000 m² office and manufacturing facility
- site servicing, roads, parking for 22 ha campus
- precise environmental control in manufacturing/packaging
- stringent vibration limits for manufacturing
- fast-track design and construction
|
| JDS UNIPHASE |
| Clean Room Manufacturing |
![header=[CANADIAN BLOOD SERVICES<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>new 1300 m² collection clinic
</li><li>new 1700 m² manufacturing and distribution facility
</li><li>public reception, donation suite and canteen
</li><li>climate controlled manufacturing, packaging and shipping
</li><li>critical systems redundancy, 100% emergency power</li></ul>] CANADIAN BLOOD SERVICES](/images/projects/1_10.jpg) CANADIAN BLOOD SERVICES OTTAWA, ONTARIO - new 1300 m² collection clinic
- new 1700 m² manufacturing and distribution facility
- public reception, donation suite and canteen
- climate controlled manufacturing, packaging and shipping
- critical systems redundancy, 100% emergency power
|
| CANADIAN BLOOD SERVICES |
| Collection and Manufacturing |
 | ![header=[MDS NORDION KRMF FACILITY<br>KANATA, ONTARIO] body=[<ul class='photo_info'><li>$15 M radiopharmaceutical manufacturing facility
</li><li>Class 100 and 10,000 FDA approved suites
</li><li>nuclear containment ventilation system
</li><li>clean steam utilities
</li><li>central heating and cooling plant</li></ul>] MDS NORDION KRMF FACILITY](/images/projects/1_11.jpg) MDS NORDION KRMF FACILITY KANATA, ONTARIO - $15 M radiopharmaceutical manufacturing facility
- Class 100 and 10,000 FDA approved suites
- nuclear containment ventilation system
- clean steam utilities
- central heating and cooling plant
|
| MDS NORDION KRMF |
| Radiopharmaceutical Manufacturing |
![header=[TIMMINS REGIONAL ATHLETICS & SOCCER COMPLEX<br>TIMMINS, ONTARIO] body=[<ul class='photo_info'><li>$4.2 M outdoor recreational complex
</li><li>400 m IAAF certified track
</li><li>two natural turf soccer fields to FIFA International standards
</li><li>1,000 seat bleachers, press boxes, change rooms and canteen
</li><li>fully lit for night competition</li></ul>] TIMMINS REGIONAL ATHLETICS & SOCCER COMPLEX](/images/projects/1_12.jpg) TIMMINS REGIONAL ATHLETICS & SOCCER COMPLEX TIMMINS, ONTARIO - $4.2 M outdoor recreational complex
- 400 m IAAF certified track
- two natural turf soccer fields to FIFA International standards
- 1,000 seat bleachers, press boxes, change rooms and canteen
- fully lit for night competition
|
| TIMMINS ATHLETICS COMPLEX |
| Soccer & Track Stadium |
 | ![header=[RAVENSVIEW WATER POLLUTION CONTROL CENTRE<br>KINGSTON, ONTARIO] body=[<ul class='photo_info'><li>$85 M upgrade to 95,000 m³/day capacity plant
</li><li>new biological aerated filter (BAF) treatment system
</li><li>anaerobic digesters, centrifuge and indoor biosolids storage
</li><li>370 kW cogeneration facility
</li><li>comprehensive Value Engineering with operations staff</li></ul>] RAVENSVIEW WATER POLLUTION CONTROL CENTRE](/images/projects/2_1.jpg) RAVENSVIEW WATER POLLUTION CONTROL CENTRE KINGSTON, ONTARIO - $85 M upgrade to 95,000 m³/day capacity plant
- new biological aerated filter (BAF) treatment system
- anaerobic digesters, centrifuge and indoor biosolids storage
- 370 kW cogeneration facility
- comprehensive Value Engineering with operations staff
|
| RAVENSVIEW WPCP |
| Wastewater Treatment |
![header=[WATER TREATMENT PLANT<br>RENFREW, ONTARIO] body=[<ul class='photo_info'><li>18,000 m³/day upgraded capacity
</li><li>$9 M construction
</li><li>new process systems including ballasted flocculation
</li><li>upgrade within confined site
</li><li>Class EA</li></ul>] WATER TREATMENT PLANT](/images/projects/2_2.jpg) WATER TREATMENT PLANT RENFREW, ONTARIO - 18,000 m³/day upgraded capacity
- $9 M construction
- new process systems including ballasted flocculation
- upgrade within confined site
- Class EA
|
| RENFREW WTP |
| Water Treatment |
![header=[BRITANNIA STORM SEWER AND DETENTION POND<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>$5 M storm sewer and detention pond
</li><li>1,200 m long by 4.2 m wide cast in place box sewer
</li><li>siphon under two large trunk watermains
</li><li>two “wet ponds” for quantity and quality control
</li><li>adjacent to environmentally sensitive wetlands</li></ul>] BRITANNIA STORM SEWER AND DETENTION POND](/images/projects/2_3.jpg) BRITANNIA STORM SEWER AND DETENTION POND OTTAWA, ONTARIO - $5 M storm sewer and detention pond
- 1,200 m long by 4.2 m wide cast in place box sewer
- siphon under two large trunk watermains
- two “wet ponds” for quantity and quality control
- adjacent to environmentally sensitive wetlands
|
| BRITANNIA STORMWATER |
| Stormwater Collection & Treatment |
![header=[BRIDLEWOOD SUBDIVISION<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>300 ha development with 3,000 homes
</li><li>33 km of roadway
</li><li>street lighting and utility coordination
</li><li>local and trunk infrastructure
</li><li>grading and stormwater management</li></ul>] BRIDLEWOOD SUBDIVISION](/images/projects/2_4.jpg) BRIDLEWOOD SUBDIVISION OTTAWA, ONTARIO - 300 ha development with 3,000 homes
- 33 km of roadway
- street lighting and utility coordination
- local and trunk infrastructure
- grading and stormwater management
|
| BRIDLEWOOD SUBDIVISION |
| Residential Subdivision |
![header=[KIRKWOOD AVENUE RECONSTRUCTION<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>2.3 M buried services and roadway replacement
</li><li>flooding relief project on heavily travelled arterial truck route
</li><li>disconnection of roof drains from multi-unit residential buildings
</li><li>phasing and staging plans for traffic management</li></ul>] KIRKWOOD AVENUE RECONSTRUCTION](/images/projects/2_5.jpg) KIRKWOOD AVENUE RECONSTRUCTION OTTAWA, ONTARIO - 2.3 M buried services and roadway replacement
- flooding relief project on heavily travelled arterial truck route
- disconnection of roof drains from multi-unit residential buildings
- phasing and staging plans for traffic management
|
| KIRKWOOD AVENUE RECONSTRUCTION |
| Infrastructure & Roadway Replacement |
 | ![header=[TRAIL ROAD LANDFILL<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>multiple liner/cap installations
</li><li>full EA for capacity expansion
</li><li>3D simulation of expansion options
</li><li>gas and leachate collection
</li><li>public drop-off facility</li></ul>] TRAIL ROAD LANDFILL](/images/projects/2_6.jpg) TRAIL ROAD LANDFILL OTTAWA, ONTARIO - multiple liner/cap installations
- full EA for capacity expansion
- 3D simulation of expansion options
- gas and leachate collection
- public drop-off facility
|
| TRAIL ROAD LANDFILL |
| Solid Waste Management |
![header=[OTTAWA VALLEY WASTE RECOVERY CENTRE<br>TOWNSHIP OF LAURENTIAN VALLEY, ONTARIO] body=[<ul class='photo_info'><li>$10 M waste recovery facility
</li><li>2,300 m² recycling facility
</li><li>750 m2 composting facility
</li><li>construction waste, waste oil, hazardous household waste
</li><li>65% waste diversion goal</li></ul>] OTTAWA VALLEY WASTE RECOVERY CENTRE](/images/projects/2_7.jpg) OTTAWA VALLEY WASTE RECOVERY CENTRE TOWNSHIP OF LAURENTIAN VALLEY, ONTARIO - $10 M waste recovery facility
- 2,300 m² recycling facility
- 750 m2 composting facility
- construction waste, waste oil, hazardous household waste
- 65% waste diversion goal
|
| OTTAWA VALLEY WASTE RECOVERY |
| Recycling & Composting Facility |
![header=[BAYSHORE TRANSITWAY STATION<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>$8 M bus transitway station
</li><li>north, centre and south station towers
</li><li>pedestrian bridges interconnecting towers and shopping centre
</li><li>IES lighting award</li></ul>] BAYSHORE TRANSITWAY STATION](/images/projects/2_8.jpg) BAYSHORE TRANSITWAY STATION OTTAWA, ONTARIO - $8 M bus transitway station
- north, centre and south station towers
- pedestrian bridges interconnecting towers and shopping centre
- IES lighting award
|
| BAYSHORE TRANSITWAY STATION |
| Bus Transitway Station |
![header=[CN RAIL PEDESTRIAN UNDERPASS<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>pedestrian underpass at Heron Road Transit Station
</li><li>preassembled “through plate girder” steel span bridge
</li><li>precast concrete wing walls on cast-in-place abutments
</li><li>construction completed during 13 hour rail line closure</li></ul>] CN RAIL PEDESTRIAN UNDERPASS](/images/projects/2_9.jpg) CN RAIL PEDESTRIAN UNDERPASS OTTAWA, ONTARIO - pedestrian underpass at Heron Road Transit Station
- preassembled “through plate girder” steel span bridge
- precast concrete wing walls on cast-in-place abutments
- construction completed during 13 hour rail line closure
|
| CN RAIL UNDERPASS |
| Railway Bridge Replacement |
![header=[DOMTAR INC. BANNERMAN DAM REPLACEMENT<br>LAKE ONAPING, ONTARIO] body=[<ul class='photo_info'><li>replacement of existing dam structure
</li><li>new 5 m high concrete structure
</li><li>new control gate and 25 m spillway weir
</li><li>existing dam used as coffer dam</li></ul>] DOMTAR INC. BANNERMAN DAM REPLACEMENT](/images/projects/2_10.jpg) DOMTAR INC. BANNERMAN DAM REPLACEMENT LAKE ONAPING, ONTARIO - replacement of existing dam structure
- new 5 m high concrete structure
- new control gate and 25 m spillway weir
- existing dam used as coffer dam
|
| DOMTAR INC. BANNERMAN DAM |
| Dam Replacement |
 | ![header=[WEB GIS<br>MISSISSIPPI MILLS, ONTARIO] body=[<ul class='photo_info'><li>open source intranet/internet GIS
</li><li>planning, public works, parks/recreation, emergency services layers
</li><li>streamlines costs for desktop GIS licenses</li></ul>] WEB GIS](/images/projects/2_11.jpg) WEB GIS MISSISSIPPI MILLS, ONTARIO - open source intranet/internet GIS
- planning, public works, parks/recreation, emergency services layers
- streamlines costs for desktop GIS licenses
|
| MISSISSIPPI MILLS GIS |
| Web Based GIS |
![header=[AGRI-ECO PARK<br>MOOSE CREEK, ONTARIO] body=[<ul class='photo_info'><li>eco-industrial subdivision
</li><li>composting and waste management facilities
</li><li>concept plan development - issues of access and block layout
</li><li>infrastructure and servicing assessments
</li><li>planning, engineering and project management</li></ul>] AGRI-ECO PARK](/images/projects/2_12.jpg) AGRI-ECO PARK MOOSE CREEK, ONTARIO - eco-industrial subdivision
- composting and waste management facilities
- concept plan development - issues of access and block layout
- infrastructure and servicing assessments
- planning, engineering and project management
|
| AGRI-ECO PARK |
| Eco-Industrial Subdivision |
 | ![header=[IGPC ETHANOL PLANT<br>AYLMER, ONTARIO] body=[<ul class='photo_info'><li>new $90 M fuel grade ethanol plant
</li><li>fast-track design/build delivery
</li><li>steel structure, insulated steel roof and cladding
</li><li>service catwalks, pipe racking, tank bases
</li><li>HVAC, fire protection, lighting and power</li></ul>] IGPC ETHANOL PLANT](/images/projects/3_1.jpg) IGPC ETHANOL PLANT AYLMER, ONTARIO - new $90 M fuel grade ethanol plant
- fast-track design/build delivery
- steel structure, insulated steel roof and cladding
- service catwalks, pipe racking, tank bases
- HVAC, fire protection, lighting and power
|
| IGPC ETHANOL |
| Fuel Grade Ethanol Plant |
![header=[LAFARGE AGGREGATE PLANT EXPANSION<br>TEXADA ISLAND, BRITISH COLUMBIA] body=[<ul class='photo_info'><li>120 m long by 38 m high elevated stockpiling conveyor line
</li><li>crusher supplementation
</li><li>two 3-deck screens and 4 moveable cross-conveyors
</li><li>plant capacity increased from 900 to 2,000 tons/hour peak</li></ul>] LAFARGE AGGREGATE PLANT EXPANSION](/images/projects/3_2.jpg) LAFARGE AGGREGATE PLANT EXPANSION TEXADA ISLAND, BRITISH COLUMBIA - 120 m long by 38 m high elevated stockpiling conveyor line
- crusher supplementation
- two 3-deck screens and 4 moveable cross-conveyors
- plant capacity increased from 900 to 2,000 tons/hour peak
|
| TEXADA AGGREGATES |
| Aggregate Processing |
![header=[SHELL CANADA LUBRICANTS PLANT EXPANSION<br>BROCKVILLE, ONTARIO] body=[<ul class='photo_info'><li>$15 M expansion of lubricant blending facility
</li><li>tank farm expansion including new tanks and containment
</li><li>9 additional railcar loading/unloading stations
</li><li>pipe rack expansions for 1500 m of pipe
</li><li>phased, fast track construction in continuously operational plant</li></ul>] SHELL CANADA LUBRICANTS PLANT EXPANSION](/images/projects/3_3.jpg) SHELL CANADA LUBRICANTS PLANT EXPANSION BROCKVILLE, ONTARIO - $15 M expansion of lubricant blending facility
- tank farm expansion including new tanks and containment
- 9 additional railcar loading/unloading stations
- pipe rack expansions for 1500 m of pipe
- phased, fast track construction in continuously operational plant
|
| SHELL CANADA |
| Lubricants Plant Expansion |
![header=[INCO SUPER STACK REINFORCEMENT<br>SUDBURY, ONTARIO] body=[<ul class='photo_info'><li>1250 ft. flue stack at Copper Cliff Smelter
</li><li>$7.5 M investigation/reinforcement program
</li><li>phased shoring/repair of steel flue liner and breeching
</li><li>continuous deflection monitoring and alarm protocol</li></ul>] INCO SUPER STACK REINFORCEMENT](/images/projects/3_4.jpg) INCO SUPER STACK REINFORCEMENT SUDBURY, ONTARIO - 1250 ft. flue stack at Copper Cliff Smelter
- $7.5 M investigation/reinforcement program
- phased shoring/repair of steel flue liner and breeching
- continuous deflection monitoring and alarm protocol
|
| INCO SUPER STACK |
| Flue & Breeching Resupport |
![header=[BURNBRAE FARMS<br>ONTARIO, QUEBEC, MANITOBA, ALBERTA, NEW BRUNSWICK] body=[<ul class='photo_info'><li>egg grading, processing and distribution plants across Canada
</li><li>plant expansions, upgrades and process modifications
</li><li>ongoing engineering/architectural services for past 40 years
</li><li>structure, envelope, layout, HVAC, process piping, lighting, power</li></ul>] BURNBRAE FARMS](/images/projects/3_5.jpg) BURNBRAE FARMS ONTARIO, QUEBEC, MANITOBA, ALBERTA, NEW BRUNSWICK - egg grading, processing and distribution plants across Canada
- plant expansions, upgrades and process modifications
- ongoing engineering/architectural services for past 40 years
- structure, envelope, layout, HVAC, process piping, lighting, power
|
| BURNBRAE FARMS |
| Egg Grading & Processing |
 | ![header=[CHARLES SIM VEHICLE MAINTENANCE BUILDING<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>15,000 m² vehicle maintenance and repair facility
</li><li>35 car/truck service bays
</li><li>welding, bodywork, carpentry and machine shops
</li><li>100 m2 cross draft paint booth
</li><li>tailpipe exhaust/lubrication assemblies on swing beams and reels</li></ul>] CHARLES SIM VEHICLE MAINTENANCE BUILDING](/images/projects/3_6.jpg) CHARLES SIM VEHICLE MAINTENANCE BUILDING OTTAWA, ONTARIO - 15,000 m² vehicle maintenance and repair facility
- 35 car/truck service bays
- welding, bodywork, carpentry and machine shops
- 100 m2 cross draft paint booth
- tailpipe exhaust/lubrication assemblies on swing beams and reels
|
| CHARLES SIM BUILDING |
| Vehicle Maintenance & Repair |
![header=[VALE INCO CLARABELLE MILL<br>SUDBURY, ONTARIO] body=[<ul class='photo_info'><li>$7 M, 11,000 m² roof deck/membrane replacement
</li><li>haydite slabs replaced with steel deck and insulated BUR
</li><li>movable scaffolding protected constructors and plant operations
</li><li>plant remained fully operational throughout construction</li></ul>] VALE INCO CLARABELLE MILL](/images/projects/3_7.jpg) VALE INCO CLARABELLE MILL SUDBURY, ONTARIO - $7 M, 11,000 m² roof deck/membrane replacement
- haydite slabs replaced with steel deck and insulated BUR
- movable scaffolding protected constructors and plant operations
- plant remained fully operational throughout construction
|
| VALE INCO |
| Roof Replacement |
![header=[TAILINGS LINE - XSTRATA NICKEL STRATHCONA MILL<br>LEVACK, ONTARIO] body=[<ul class='photo_info'><li>dual tailings line extension
</li><li>piping design
</li><li>access road design
</li><li>site review and contract administration</li></ul>] TAILINGS LINE - XSTRATA NICKEL STRATHCONA MILL](/images/projects/3_8.jpg) TAILINGS LINE - XSTRATA NICKEL STRATHCONA MILL LEVACK, ONTARIO - dual tailings line extension
- piping design
- access road design
- site review and contract administration
|
| XSTRATA TAILINGS LINE |
| Mining Support |
![header=[TEMBEC SAWMILL LINE<br>TIMMINS, ONTARIO] body=[<ul class='photo_info'><li>replacement of 300 ft. sawmill line
</li><li>new high speed electronically controlled line
</li><li>conversion over two week scheduled shutdown
</li><li>coordination, power, structure, hydraulic/pneumatic piping</li></ul>] TEMBEC SAWMILL LINE](/images/projects/3_9.jpg) TEMBEC SAWMILL LINE TIMMINS, ONTARIO - replacement of 300 ft. sawmill line
- new high speed electronically controlled line
- conversion over two week scheduled shutdown
- coordination, power, structure, hydraulic/pneumatic piping
|
| TEMBEC SAWMILL LINE |
| Sawmill Line Replacement |
![header=[3M TREATER/WEB TAPE LINE<br>BROCKVILLE, ONTARIO] body=[<ul class='photo_info'><li>new tape production line
</li><li>building extension and site services
</li><li>bulk chemical unloading
</li><li>process piping, ventilation, power, grounding
</li><li>fast-track design and phased trade contract award</li></ul>] 3M TREATER/WEB TAPE LINE](/images/projects/3_10.jpg) 3M TREATER/WEB TAPE LINE BROCKVILLE, ONTARIO - new tape production line
- building extension and site services
- bulk chemical unloading
- process piping, ventilation, power, grounding
- fast-track design and phased trade contract award
|
| 3M MANUFACTURING |
| Plant Expansion |
 | ![header=[DOMTAR TURBINE PIT HEADGATE REPAIRS<br>GATINEAU, QUEBEC] body=[<ul class='photo_info'><li>repair/replacement of 100 year old hydroelectric headgate
</li><li>fast-track repair during designated shutdown
</li><li>specialized welding between old and new steel
</li><li>precise detailing of new gate to existing roller supports</li></ul>] DOMTAR TURBINE PIT HEADGATE REPAIRS](/images/projects/3_11.jpg) DOMTAR TURBINE PIT HEADGATE REPAIRS GATINEAU, QUEBEC - repair/replacement of 100 year old hydroelectric headgate
- fast-track repair during designated shutdown
- specialized welding between old and new steel
- precise detailing of new gate to existing roller supports
|
| DOMTAR HEADGATE REPAIRS |
| Plant Repairs |
![header=[OC TRANSPO ST. LAURENT COMPLEX<br>OTTAWA, ONTARIO] body=[<ul class='photo_info'><li>$60 M staged development over 20 years
</li><li>maintenance, storage and repair garages
</li><li>4 storey Administration Building
</li><li>7.0 ha site including services, roads and parking</li></ul>] OC TRANSPO ST. LAURENT COMPLEX](/images/projects/3_12.jpg) OC TRANSPO ST. LAURENT COMPLEX OTTAWA, ONTARIO - $60 M staged development over 20 years
- maintenance, storage and repair garages
- 4 storey Administration Building
- 7.0 ha site including services, roads and parking
|
| OC TRANSPO |
| Bus Maintenance/Repair |