Municipal Infrastructure
Sewer Design & RehabilitationWatermain Analysis & DesignRehabilitation ProgrammingTrenchless SolutionsMaster PlanningAsset ManagementLife Cycle CostingInvestigative Studies
OTTAWA AIRPORT INFRASTRUCTURE MASTER PLAN
OTTAWA, ONTARIO
  • condition assessment of all buried municipal infrastructure
  • sewer and watermain modelling
  • prioritized rehabilitation program
  • interactive GIS-based asset management solution
WATERMAIN REPLACEMENT
VILLAGE OF ROCKCLIFFE PARK, ONTARIO
  • $1 M watermain replacement in prominent neighbourhood
  • organic soils and environmental areas required innovative solutions
  • pipe installed using horizontal directional drilling
  • Subsurface Utility Engineering principles followed to mitigate risk
COMBINED SEWER SEPARATION
VILLAGE OF ROCKCLIFFE PARK, ONTARIO
  • 25 year plan for separation of combined sewers
  • design and approvals for phased implementation
  • 7 projects completed over 10 years
  • highly sensitive political and environmental area
  • extensive public consultation key to success of program
MILL STREET RECONSTRUCTION
KAPUSKASING, ONTARIO
  • $1 M buried services and roadway replacement
  • analysis and replacement of over capacity sanitary sewer
  • new 1500 mm storm sewer
  • new parking lane and vehicle drop-off at school
ROAD, SEWER AND WATERMAIN RECONSTRUCTION
THE GLEBE, OTTAWA, ONTARIO
  • $4.5 M buried services and roadway replacement
  • multi-year, phased construction program in affluent urban area
  • replacement of combined sewers including flow controls
  • remedial grading of overland flow routes for infrequent storm events

Municipalities, large and small, are trying to balance significant infrastructure needs with competing budget pressures. We assist our clients in establishing priorities for infrastructure renewal that are affordable, that respond to regulatory requirements and that meet the principles of environmental sustainability. At the design stage, we develop proactive solutions that are specific to the identified problem and that recognize the importance of minimizing life cycle costs.

WATER SUPPLY FEEDER
WHITEFISH LAKE FIRST NATION, NAUGHTON, ONTARIO
  • 1,200 m feeder main from City of Greater Sudbury system
  • 34 m insulated/heat-traced bridge crossing
  • directional drilling installation under second water crossing
  • flow metering building
  • hydraulic modelling of existing and new systems
ALVIN HEIGHTS TRUNK SEWER RECONSTRUCTION
OTTAWA, ONTARIO
  • detailed design and approvals for new trunk sewer
  • modelling to determine allowable flow rate through new sewer
  • extensive sections constructed in horizontal earth and rock bores
  • deep direct connection to interceptor sewer shaft
KIRKWOOD AVENUE RECONSTRUCTION
OTTAWA, ONTARIO
  • $2.3 M buried services and roadway replacement
  • flooding relief project on heavily travelled arterial truck route
  • disconnection of roof drains from multi-unit residential buildings
  • phasing and staging plans for traffic management