Client: TEi Construction Services
Location: Gordonsville, Virginia, USA
Size: N/A

The Industrial team was retained by TEi Construction Services to provide a detailed heat recovery steam generator (HRSG) economizer bundle replacement lift plan within tight project space and interference limitations. The team extensively leveraged their in-house 3D laser point cloud scanning abilities and 3D CAD modelling to determine optimum crane selection and placement for the high risk lifts.  Deliverables included coordination with crane and equipment vendors, specification of all lifting hardware, determining minimum/maximum lift angles/loads, and related erection drawings.

Other Power Generation Projects

Manufacturing & Industrial

Combustion Optimization

Manufacturing & Industrial

Litoral de Almeria Power Station

Manufacturing & Industrial

North West Redwater Sturgeon Refinery

Manufacturing & Industrial

Pressure Part Replacement

Manufacturing & Industrial

Pulverized Coal Wall-fired Burner Design

Manufacturing & Industrial

Superheater Header & Pendant Replacement