Client: City of Quinte West
Location: Quinte West, Ontario
Size: 1200l/s peak capacity
JLR led a Class Environmental Assessment (EA), design and contract administration for expansion of the Dundas Street Sewage Pump Station (SPS). JLR established design parameters and identified and evaluated options to ensure adequate pumping capacity. Dundas SPS changes included various lifecycle upgrades and expanding the wet well and dry well to house two new pumps, and construction of a new 800 mm forcemain that connects the PS to the Trenton WWTP. Additionally, a second parallel gravity sewer pipe will be constructed across the Trent River to convey wastewater to the Dundas Street SPS and provide redundancy.